+86 18531742341
Ring Lock Scaffolding - Stage & Event Special Edition
Product Overview
Zhuozhan ring lock scaffolding is an ideal choice for the performance and event industry. The system structure is lightweight and does not require any tools for connection. It only takes 15 seconds to set up a single node, significantly improving the efficiency of assembly and disassembly, saving labor and time costs. It is particularly suitable for short-term projects with frequent and rapid changes in scenarios.
Key Features of Scaffolding for Stage & Event Applications
1.Fast Assembly & Dismantling
Quick-lock design allows setup or teardown in minutes, saving labor costs for fast-paced event schedules.
Components are lightweight yet strong, making transport and manual handling easier for frequent event use.
3.Compatible with Stage Trusses & Lighting Systems
Modular connections integrate seamlessly with standard trusses, lighting grids, and platforms.
4.Hot-Dip Galvanized for Outdoor Durability
Galvanized surface resists rust and corrosion, ideal for outdoor concerts and festivals.
5.Cost-Effective for Rental Businesses
Durable for repeated use, maximizing ROI for rental and event companies.
Product Gallery
Description |
Explanation |
|
Product |
Ringlock scaffolding |
|
Type |
Scaffolding pole |
Horizontal Rod |
Size |
1000-2500mm |
300-1200mm |
Wall thickness |
2.75mm |
3.25mm |
Standard |
EN 12810 / 12811 |
|
Surface treatment |
Hot-dip galvanizing/Electro-galvanizing/Spray painting |
|
Application |
Construction engineering, Bridges and transportation, industry and energy, etc |
|
Packaging |
Steel Pallet、Plastic-Wrapped Bundles、Or package as per the customer's requirements |
|
Delivery time |
30 to 45 days from the date of drawing confirmation. |
|
Payment Terms |
T/T or L/C at sight |
|
Product parameters
|
Standard Specifications for Vertical Bars |
|||||
|
Tube diameter(mm) |
Tube thickness(mm) |
Material |
Weight(kg) |
Length(mm) |
Surface treatment |
|
48 |
3.25 |
Q235 |
12.75 |
2500 |
Hot-dip galvanizing80μm |
|
48 |
3.25 |
Q235 |
10.45 |
2000 |
Hot-dip galvanizing80μm |
|
48 |
3.25 |
Q235 |
8.02 |
1500 |
Hot-dip galvanizing80μm |
|
48 |
3.25 |
Q235 |
5.17 |
1000 |
Hot-dip galvanizing80μm |
|
Standard Specifications for Horizontal Bars |
|||||
|
Tube diameter(mm) |
Tube thickness(mm) |
Material |
Weight(kg) |
Length(mm) |
Surface treatment |
|
48 |
2.75 |
Q235 |
1.41 |
300 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
2.39 |
600 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
3.34 |
900 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
4.29 |
1200 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
5.24 |
1500 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
6.14 |
1800 |
Hot-dip galvanizing80μm |
|
Specifications and Standards for Diagonal Bracing |
|||||
|
Tube diameter(mm) |
Tube thickness(mm) |
Material |
Weight(kg) |
Length(mm) |
Surface treatment |
|
48 |
2.75 |
Q235 |
5.37 |
600*1500-1600 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
5.67 |
900*1500-1700 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
6.04 |
1200*1500-1860 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
6.44 |
1500*1500-2040 |
Hot-dip galvanizing80μm |
|
48 |
2.75 |
Q235 |
7.04 |
1800*1500-2240 |
Hot-dip galvanizing80μm |
Successfully applied to large projects
Zhuozhan's interlocking scaffolding has been widely used in concerts, sports events, festivals, rallies and public events around the world. With its advantages of stability, reliability and fast construction, it is deeply trusted by various stage design, construction and event companies, helping to create safe and stunning stage effects.
Project Case
Temporary stage for the 2023 Bangkok Summer Outdoor Music Festival
Location: Bangkok, Thailand
Project Type: Main stage & Lighting support structure for large-scale outdoor concerts
Scaffolding usage
Use Zhuozhan Q345 hot-dip galvanized ring lock scaffolding
Build the main stage platform + left and right extension platforms + rear lighting tower structure
It covers an area of approximately 800 square meters and has a maximum height of 9 meters
The construction team completed the overall setup in less than 48 hours
Reason for selection
In high-temperature and humid environments, hot-dip galvanized frame structures exhibit excellent corrosion resistance
The structural modular design enables quick layout adjustment on site
All components are lightweight and easy to handle by hand, without the need for additional machinery
The quick-installation system saves at least 30% of the setup time
Result
Even in the midst of high temperatures and sudden thunderstorms, the stage structure remains as stable as ever. The customer praised the system for greatly enhancing efficiency and said it would be the preferred solution for their future activities.










