Leave Your Message

Production Process Flow and Pollution Discharge Nodes of Vertical Rods

First, perform blanking and cutting, which will generate noise and solid waste; then punch holes, which will also generate noise and solid waste; subsequently, automatically weld the steel pipe and the disc black parts. In this process, in addition to noise, it will also generate waste gas and solid waste; then conduct outsourcing galvanizing; finally, the finished products are waiting for sale. Multiple links in the processing process will generate pollutants and need to be effectively managed and controlled.

  • project_arr
    Blanking and Cutting (in Points)
    This is the first step in steel pipe processing. During this process, noise (N) and solid waste (S) will be generated.
  • project_arr
    Punching
    After blanking and cutting, the steel pipe enters the punching process. This link will also generate noise (N) and solid waste (S).
  • project_arr
    Automatic Welding
    The punched steel pipe is automatically welded with the disc black parts. This process will generate noise (N), waste gas (G) and solid waste (S).
  • project_arr
    Outsourcing Galvanizing
    After the automatic welding is completed, a white part is formed, and the white part needs to be outsourced for galvanizing treatment.
  • project_arr
    Finished Products for Sale
    After the outsourcing galvanizing treatment, the steel pipe becomes a finished product and waits for sale.
Inquiry & Order
photobank (11)
photobank (10)
photobank (12)
photobank (17)
photobank (18)
photobank (19)
photobank (20)
photobank (21)
photobank (22)
010203040506070809

Production Process Flow and Pollution Discharge Nodes of Horizontal Rods

First, perform blanking and cutting, which will generate noise and solid waste; then punch holes, which will also generate noise and solid waste; then automatically weld the punched steel pipe with the casting black parts, which will generate waste gas, noise and solid waste; then conduct outsourcing galvanizing; then rivet the insert with the galvanized white part, which will generate noise; finally, the finished products are waiting for sale. Multiple links in the processing process generate pollutants and need to be treated with environmental protection measures.

  • project_arr
    Blanking and Cutting
    The raw material is a steel pipe. This process will generate noise (N) and solid waste (S).
  • project_arr
    Punching
    Following the blanking and cutting process, it will generate noise (N) and solid waste (S).
  • project_arr
    Automatic Welding
    This process welds the punched steel pipe with the casting black parts and will generate waste gas (G), noise (N) and solid waste (S).
  • project_arr
    Outsourcing Galvanizing
    The automatic welding is carried out for the white part after outsourcing galvanizing treatment.
  • project_arr
    Riveting
    The insert is riveted with the outsourced galvanized workpiece, which will generate noise (N).
  • project_arr
    Finished Products for Sale
    After the above processes, the product becomes a finished product and waits for sale.
Inquiry & Order
photobank (11)
photobank (13)
photobank (14)
photobank (15)
photobank (16)
photobank (23)
photobank (24)
01020304050607